A look beneath the surface
As we approach the next phase of construction, the past week onsite was spent pulling the soil away from the foundation and smoothing the surface layer on the AB building site. Also in progress is the construction and development team review of building AB garage shop & erection plans.
AB Building Foundation
The AB building site's infrastructure and garage foundations were the first to be completed during the last construction phase. Each area had been dug wider than the foundations in order to place the foundation boxes and pour the concrete. For safety precautions, soil had been put into the gaps around the foundations so that no person or animal could fall into the gaps. Naturally some of this dirt covered the foundations and some foliage growth occurred overtime.
Progress made mid-week as the soil was pulled away from the foundations and used to build up the land surrounding the foundations.
AB Bldg. Site Clearing
Start: foundation covered with foliage growth. End: site cleared and cleaned.
Garage Drawings: Review & Edit Stage
AB Building Garage Precast Shops and Erection drawings are in the review and edit process with our construction team:
- Architects
- Contractors
- Developer
- Engineers
- Erector
- Precast Specialty Engineers
- Precaster